Home
Up

Section 3 upper deck is complete.  I had to remove the upper deck because the signal towers got broken.  I built the first set and broke two of them while installing them.  I built a second set and broke them when installing the deck.  I kept bumping the fiber optic wires.  I finally encased them completely within styrene tubing.  So far so good.

Click on the photos to see larger photo.  Click back to return.

S3U-01.jpg (174138 bytes)    Section 3 upper deck

S3U-02.jpg (593242 bytes)    Left signal towers

S3U-03.jpg (623963 bytes)    Right signal towers

S3L-01.jpg (543457 bytes)    Section 3 lower deck - cork, ties and ballasting complete

S3L-02.jpg (564659 bytes)    Rail and turnouts next